Here you will find information about installing an automatic donut maker.


 

Installation


 

Step 1:

  • Ensure the appliance is placed in a stable flat area.
  • Choose a surface where the appliance is not exposed to direct sunlight or other heat sources. When positioning keep in mind to maintain a distance of 10 cm between object and other appliances.
  • Place the appliance is such a way that the plug is always accessible.

 

Step 2:

  • Place the support rod in the designated bracket and secure it with two bolts.
     
  • Mount the transmission box on top of the rod and secure the blots.

Diagram

Description automatically generated

Step 3:

  • Depending on the desired donut size, place one of the molds on the exit of the dispenser and fix it using the provided bolts.
  • Attach the corresponding plunger head to the plunger.

Diagram

Description automatically generated

 

Step 4:

  • Attach the dough dispenser to the support arm and tighten the wing nut, make sure the dispenser is properly centered.
  • Mount the plunger in the designated guide bracket (in the middle of the support arm). Move the plunger up and down to make sure it opens and closes the exit hole properly and smoothly.
  • Attach the crankshaft to the plunger.
  • Connect all the necessary wires and cables.
  • Plug in the appliance into the main socket.

Diagram

Description automatically generated