Here you will information about installing a vacuum packing machine.

 

Installation


Step 1: 

  • The machine is already filled with oil, but you must check if the oil level is sufficient. When running, the oil level should not be lower than 1/2 height of the oil window. Do not fill with too much oil to avoid overflow. When needed fill the vacuum pump with HFV-32 high-speed vacuum pump oil or 32N lubricant before use (when the machine is placed at a horizontal position, the oil level should be at 3/4 of oil window). 
     

Step 2: 

  • The machine should be placed horizontally with good ventilation, without corrosive gas or dust. The power connection may be different in your location, so be sure to check for grounding protection before use.
     

Step 3: 

  • Always ensure top cover is open before turning the power on. Start the machine by pressing the top cover and the process start automatically (for electric cover series, turn on the power supply and the top cover will automatically open, by pressing the start button, which is located on the control panel, the process cycle will be started). 

For 3-phase vacuum machinery; please be sure that the vacuum pump is running in the correct direction. If the direction is wrong, simply change the internal wiring of the power plug. 

 

Step 4: 

  • Preheating of the vacuum pump must be done in a low temperature working area. Turn off the heating process by pressing the ''SEALING TEMPERATURE'' key on the control panel. This is to prevent the heating process and to decrease wear and tear. 

Run the vacuum pump a few times before first use and the machine is ready to use!